My plaster supply is all but gone at the moment ... I have about 1 cup left. That is 25 pounds of plaster so far. I will say there is a goodly chunk of waste that comes along with casting ... I've gotten much better but my initial casting was not very efficient.
I have 10 pounds of plaster on order ... and it says it should be delivered today.
My effort this round has been on catching up the side outer wall and tower to the "floor" height of the ramparts. I also finished up the interior of the door through the side wall and added the door between the interior hallway and center of the Hornburg. I got the stairs done and floor for the center Hornburg and I'm slowly building up the interior wall.
I'll be finishing up the floor for the hallway and stairs leading up to the entrance to the center part. Once the flooring is complete I can start building up the interior wall higher ... much higher now and it will make it a little more difficult to do the floor.
The good news in my big fat hands can easily reach into the hallway.
I'll be starting into the floor of the ramparts when the new plaster arrives and building up the rear tower ... that should be done in the next update if all goes to plan ... ha!
 |
Put out a Perry Miniatures ACW figure so you can get an idea of the scale ... |
Starting to take better form now ... stay tuned for more updates!